Project Control Method Discussion Study Essay Assignment Help
Course name: project control method
Week 8 online activity
Instruction:
weekly task (300 words in total, exclude references)
Do not required essay format, just answer weekly question
Give 300 words with 2-3 references (Harvard style)
Must read suggestion reading I offered in attachment
For this week’s online activity, you are asked to produce a small example of the use of the EVM method. You need to work on an example with less than 10 activities. Preferably should be inspired by a real project from your work (or a small part of a project) or, if this is not possible, “invent” the project.
In the example, after stating the status date, you should at least provide the following EVM indices: CV, SV, SPI, CPI, EAC, TCPI.
You need to create the example yourselves and you should not take the example from a book or other source.
For this week’s activity you will not comment on each other’s postings (no forum available) – this is an individual endeavor.
Attention for writer: all work experience (like organization, work performance) you write for, please put it as your friend experience, do not say your own experience
Requirements
Submit the outcome of this activity through Learnonline.
Provide the problem and the solution.
Explain really briefly (no need to worry about word count) the project and the situation and show the exact calculations for at least one activity and the project as a whole.
You may do the calculations in an Excel or other file but in the end, everything should be integrated in one pdf file.